July 26 , 2019
1940 days
1099
- Government has set a target for installation of Rooftop Solar projects (RTS) of 40,000 MegaWatt (MW) by 2022.
- As of 18 July 2019, over 1700 Mega Watt of grid-connected rooftop systems has been installed in India.
- Top Three states that have installed rooftop solar projects are: Gujarat, Maharashtra and Tamil Nadu.
Post Views:
1099