TNPSC Thervupettagam

First interstate connected wind power project

August 27 , 2018 2283 days 949 0
  • 126 MW wind power capacity, part of India’s first inter-state transmission system (ISTS) auction, was commissioned in Bhuj, Gujarat.
  • It was part of India’s first ISTS auction was conducted by state-run Solar Energy Corporation of India Ltd (SECI) in February 2017.
  • The project is undertaken by Ostra Kutch Wind private Limited.
  • Through ISTS, power generated from one state can be transmitted to other deficient states.
  • The energy generated from this project in Gujarat is purchased by Bihar, Odisha, Jharkhand and Uttar Pradesh.

Leave a Reply

Your Comment is awaiting moderation.

Your email address will not be published. Required fields are marked *

Categories