Kakrapar Atomic Power Project Unit 4
December 22 , 2023
386 days
417
- The fourth unit of the Kakrapar Atomic Power Project (KAPP-4) in Gujarat, became critical.
- The 700 MWe units are the largest indigenous nuclear power reactors to be built by the Nuclear Power Corporation of India Limited.
- The reactor’s first criticality was ascertained after it met all the conditions set out by the Atomic Energy Regulatory Board.
- The NPCIL presently operates 23 nuclear electricity reactors with a total capacity of 7,480 MWe.
Post Views:
417