Mettur dam water release 2024
June 15 , 2024
195 days
1244
- The opening of the Mettur dam in Salem, for irrigation in the Cauvery delta, missed its customary date of June 12 this year.
- This is the first time in five years the date has been missed.
- 13.97 thousand million cubic feet (tmc ft) only available against its full capacity of 93.47 tmc ft, as the reason the dam was not opened this year.
- The water level stands at 43.52 feet against its full capacity of 120 feet.
- Inflow to the dam was 404 cubic feet per second (cusecs) while the discharge was kept at 1,500 cusecs.
- Normally, the release from Mettur for irrigation takes care of 3.24 lakh acres during the short-term cultivation season kuruvai.
- But, in the past five years, the coverage has hovered between 2.9 lakh acres during 2019-20 to 5.6 lakh acres.
Post Views:
1244