TNPSC Thervupettagam

Operationalization of the EDFC

October 19 , 2023 396 days 388 0
  • The entire 1337-km length of the Rs 51,000-crore Eastern Dedicated Freight Corridor (EDFC) was declared operational recently.
  • The trail run of the first freight train over the 401-kilometre long New Sahnewal (Punjab) – to New Khurja (Uttar Pradesh) section of the EDFC conducted successfully.
  • The Western Dedicated Freight Corridor (WDFC) is covering a length of 1046 kilometers.
  • It will be connecting Khurja to Jawaharlal Nehru Port in Maharashtra.

Leave a Reply

Your Comment is awaiting moderation.

Your email address will not be published. Required fields are marked *

Categories