Rooftop Solar Programme

February 12 , 2023 571 days 449 0
  • The government has extended PM-KUSUM scheme till March 2026.
  • Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) Launched in 2019.
  • It aims to adding solar capacity of 30,800 MW by 2022.
  • The scheme consists of three components:
    • Component A is for installation of 10,000 MW of solar capacity by installing small power plants of capacity up to 2 MW
    • Component B aims at installation of 20 lakh standalone solar-powered agriculture pumps and
    • Component C is for solarisation of 15 lakh grid-connected agriculture pumps.