TNPSC Thervupettagam

Wind project addition to peak by 2024

August 29 , 2022 814 days 591 0
  • The annual installation of new wind power projects in India will peak by 2024 and likely decline thereafter.
  • After 2024, fresh projects are likely to be wind-solar hybrids.
  • This is reported by the Global Wind Energy Council (GWEC) and MEC Intelligence (MEC+).
  • India currently has 13.4 GW of prospective projects in wind energy.
  • It is expected to drive installations until 2024 in the market.
  • India is expected to add 3.2 GW in 2022.
  • 4.1 GW in 2023 is peaking to 4.6 GW in 2024.
  • Thereafter there will be a declining to 4 GW and 3.5 GW in the next two years.
  • Wind industry installations have been slowing down in India since 2017.
  • Only 1.45 GW of wind projects were installed in 2021.

Leave a Reply

Your Comment is awaiting moderation.

Your email address will not be published. Required fields are marked *

Categories